Abstract

At present, the scale of sluice construction in China is becoming larger and larger. How to solve the difficulties in engineering construction and improve the quality of sluice project is the key to ensure the development of water conservancy projects during the "fourteenth five year plan". In water conservancy projects, sluice is the key hydraulic structure for flood control, storage and drainage. It is mainly constructed through the sluice gate to retain water, the drip head in the discharge and the hydraulic structure, so as to play the role of water storage, interception, control, tide retaining and interception, so as to ensure the smooth development of upstream water diversion operation and ensure the actual demand of navigation. When the sluice gate is opened, it can achieve the purpose of drainage, scouring and silting, and water diversion. At the same time, it can dynamically adjust the flow according to the downstream water demand. At present, sluices are widely used in coastal areas, reservoirs, lakes, canals, rivers and other areas in China. Its quality directly affects the safety of people's lives and property. However, the construction quality problems often occur in the sluice construction because of its complicated process and complex construction environment. Therefore, in order to ensure the application effect of the sluice and the application effect of the sluice, this paper puts forward the control ideas for the difficulties in the construction process of the sluice, in order to achieve the effect of standardized management.

Published in Science Innovation (Volume 9, Issue 4)
DOI 10.11648/j.si.20210904.21
Page(s) 173-175
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2021. Published by Science Publishing Group

Keywords

Smart Water System, Urban Water Supply, Application, Research

References
[1] 杨爱山,傅建.浅析水闸现代化运行管理[J].治淮,2020,(10):44-46.
[2] 程燕.水闸施工技术在水利工程中应用[J].建筑遗产,2013,(19):304-304.
[3] 申婉.探讨水闸规范化管理中的难点与思路[J].建筑与装饰,2020,(14):88-89.
[4] 易景文.中小型水闸维修养护关键技术及规范化管理分析[J].科技经济导刊,2020,28(21):47-48.
[5] 邹志忠.浅谈大跨度钢结构施工质量控制中重点、难点以及重难点的解决[J].中国包装科技博览,2010,(19):129-130.
[6] 孔令清.水闸规范化管理中的难点与思路[J].江淮水利科技,2020,(01):12-13.
[7] 熊有松.总承包管理模式下的质量管理[J].建筑模拟,2019,(02):13-14.
[8] 刘同旭.平原地区病险水闸危害现状及规范化管理对策探析[J].地下水,2019,44(04):221-222.
[9] 徐荣光.建筑工程质量监督工作中存在的问题与建议 [J].建筑细部,2019,(05):23-23.
[10] 钟胜文.工程施工企业信息化管理应用 [J].科学与财富,2017,(24):26-27.
[11] 王海方.浅谈水利水电工程中的水闸施工技术 [J].建筑细部,2018,(16):39-40.
[12] 高玉琴,陈鸿玉,肖璇,徐津.基于云理论的大中型水闸工程管理现代化评价[J].水利经济,2020,35(02):63-68+78.
[13] 张学龙.浅谈商品混凝土质量现状及管控措施 [J].商品混凝土,2018,(12):17-19.
[14] 商涛,姜延强,罗建刚.芦家河管理处加强水闸规范化管理的措施[J].山东水利,2021,(09):61-62.
[15] 李军凤.市政道路绿化带施工和质量控制[J].建筑细部,2010,(08):75-75.
Cite This Article
  • APA Style

    Yao Fengchun. (2021). Difficulties and Ideas in Standardized Management of Sluice. Science Innovation, 9(4), 173-175. https://doi.org/10.11648/j.si.20210904.21

    Copy | Download

    ACS Style

    Yao Fengchun. Difficulties and Ideas in Standardized Management of Sluice. Sci. Innov. 2021, 9(4), 173-175. doi: 10.11648/j.si.20210904.21

    Copy | Download

    AMA Style

    Yao Fengchun. Difficulties and Ideas in Standardized Management of Sluice. Sci Innov. 2021;9(4):173-175. doi: 10.11648/j.si.20210904.21

    Copy | Download

  • @article{10.11648/j.si.20210904.21,
      author = {Yao Fengchun},
      title = {Difficulties and Ideas in Standardized Management of Sluice},
      journal = {Science Innovation},
      volume = {9},
      number = {4},
      pages = {173-175},
      doi = {10.11648/j.si.20210904.21},
      url = {https://doi.org/10.11648/j.si.20210904.21},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.si.20210904.21},
      abstract = {At present, the scale of sluice construction in China is becoming larger and larger. How to solve the difficulties in engineering construction and improve the quality of sluice project is the key to ensure the development of water conservancy projects during the "fourteenth five year plan". In water conservancy projects, sluice is the key hydraulic structure for flood control, storage and drainage. It is mainly constructed through the sluice gate to retain water, the drip head in the discharge and the hydraulic structure, so as to play the role of water storage, interception, control, tide retaining and interception, so as to ensure the smooth development of upstream water diversion operation and ensure the actual demand of navigation. When the sluice gate is opened, it can achieve the purpose of drainage, scouring and silting, and water diversion. At the same time, it can dynamically adjust the flow according to the downstream water demand. At present, sluices are widely used in coastal areas, reservoirs, lakes, canals, rivers and other areas in China. Its quality directly affects the safety of people's lives and property. However, the construction quality problems often occur in the sluice construction because of its complicated process and complex construction environment. Therefore, in order to ensure the application effect of the sluice and the application effect of the sluice, this paper puts forward the control ideas for the difficulties in the construction process of the sluice, in order to achieve the effect of standardized management.},
     year = {2021}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Difficulties and Ideas in Standardized Management of Sluice
    AU  - Yao Fengchun
    Y1  - 2021/07/09
    PY  - 2021
    N1  - https://doi.org/10.11648/j.si.20210904.21
    DO  - 10.11648/j.si.20210904.21
    T2  - Science Innovation
    JF  - Science Innovation
    JO  - Science Innovation
    SP  - 173
    EP  - 175
    PB  - Science Publishing Group
    SN  - 2328-787X
    UR  - https://doi.org/10.11648/j.si.20210904.21
    AB  - At present, the scale of sluice construction in China is becoming larger and larger. How to solve the difficulties in engineering construction and improve the quality of sluice project is the key to ensure the development of water conservancy projects during the "fourteenth five year plan". In water conservancy projects, sluice is the key hydraulic structure for flood control, storage and drainage. It is mainly constructed through the sluice gate to retain water, the drip head in the discharge and the hydraulic structure, so as to play the role of water storage, interception, control, tide retaining and interception, so as to ensure the smooth development of upstream water diversion operation and ensure the actual demand of navigation. When the sluice gate is opened, it can achieve the purpose of drainage, scouring and silting, and water diversion. At the same time, it can dynamically adjust the flow according to the downstream water demand. At present, sluices are widely used in coastal areas, reservoirs, lakes, canals, rivers and other areas in China. Its quality directly affects the safety of people's lives and property. However, the construction quality problems often occur in the sluice construction because of its complicated process and complex construction environment. Therefore, in order to ensure the application effect of the sluice and the application effect of the sluice, this paper puts forward the control ideas for the difficulties in the construction process of the sluice, in order to achieve the effect of standardized management.
    VL  - 9
    IS  - 4
    ER  - 

    Copy | Download

Author Information
  • Water Supply Bureau of Shandong Yellow River Bureau, Jinan, China

  • Sections